General contracting in Richmond and the Lower Mainland, including ALR and farm builds
General contracting and construction management in BC through our licensed builder and general contractor, planned around the ALR, ALC and municipal rules your site carries.
Titrin's construction division is led by our licensed builder and general contractor: demolition and earthworks, foundations, framing, roofing, finishing, and landscaping, for residential, custom, multi-unit, and commercial builds. Where the site is in the ALR or carries ALC or municipal conditions, the same firm prepares the agrology and the applications, so the build is planned around the house size, siting, soil and fill rules from the start. One team, one point of accountability.
What's included
- A single construction lead, Titrin's licensed builder & general contractor, coordinating estimates, all trades, equipment, schedule, and budget from demolition through final inspection
- On ALR sites, a check of the design against the provincial house size limit, the municipal zoning and the fill rules before the permit set is finalised
- Site preparation, demolition, excavation, and earthworks managed in sequence with your servicing and grading needs
- Concrete foundations and retaining walls, structural framing in wood or steel, roofing, insulation, and drywall
- Interior and exterior renovations plus landscaping and site development to finish the property
- Permit coordination and inspection scheduling kept aligned with your ALR, ALC, and municipal approvals
- Regular progress reporting on milestones, change orders, and the construction timeline
- Trade and supplier management with quality checks at each build stage
- A construction program that stays consistent with the agricultural and environmental conditions Titrin assessed up front
Construction and general contracting in British Columbia
On regulated land, a build can stall in the gap between approval and execution. A consultant obtains the permit and hands over a stack of conditions, and the contractor builds to a drawing without a full picture of what the Agricultural Land Commission (ALC), the municipality, or the soil report required. Conditions get missed, rework follows, and sometimes a stop-work order with it.
Titrin closes that gap. We deliver general contracting and construction management through our licensed builder and general contractor, and because the same firm also handles your agrology and environmental approvals, the build is planned around your ALR, ALC, and municipal requirements from the first permit to final inspection. One team, one point of accountability, from assessment to compliance.
What this service covers
Our construction division manages every stage of the build and coordinates all trades:
- Demolition and site preparation: clearing, removals, and site readiness
- Excavation and earthworks: sequenced to your servicing, grading, and site conditions
- Concrete foundations and retaining walls
- Structural framing in wood and steel
- Roofing, insulation, and drywall
- Interior and exterior renovations
- Landscaping and site development to finish the property
- Permit coordination and project management across the full schedule
We build residential, custom, and multi-unit homes, and take on commercial construction. Whether it’s a single-family home in Richmond, a multi-unit project in the Fraser Valley, or a renovation on Vancouver Island, the same approach applies: one lead managing trades, suppliers, quality, schedule, and regulatory compliance start to finish.
When you need a general contractor who understands the land
Any substantial build benefits from a single party who owns the schedule and the trades. But some BC situations leave the standard contractor relationship exposed, and that’s where Titrin’s combined offering matters most:
- You’re building inside the Agricultural Land Reserve. The ALR carries conditions on house size, siting, soil, fill, and farm use that a typical contractor isn’t set up to track. Build outside them and you risk an enforcement file.
- Your project carries ALC or municipal approval conditions. Grading limits, soil handling, drainage considerations, and farm-use commitments have to carry through into the build, not sit forgotten in a binder.
- Your site involves soil and fill work. Where material is moved, placed, or assessed, the construction sequence and the agricultural conditions must stay in step, and a soil deposit permit may be needed beside the building permit.
- You want one firm accountable for the whole arc, assessment, permitting, and construction, instead of managing handoffs between a consultant, architect, and contractor yourself.
A straightforward build with no agricultural or regulatory overlay still gets disciplined, full-cycle general contracting. One that carries that overlay gets a builder and an agrologist working from the same file.
What the rules say when the site is in the ALR
These are the limits that most often shape a design on Agricultural Land Reserve (ALR) land. The provincial ones come from the Agricultural Land Commission Act and the ALR Use Regulation. The municipal ones below are Richmond’s, and every municipality sets its own in its zoning and soil bylaws.
- House size. Under section 20.1 of the Agricultural Land Commission Act, ALR land may have no more than one residence per parcel, and the total floor area of a principal residence must be 500 square metres or less, unless the Act, the regulations or an ALC approval permit otherwise. Richmond’s AG1 zone is tighter: the floor area of the principal dwelling and its accessory buildings is capped at the lesser of a floor area ratio calculation and 400 square metres (Zoning Bylaw 8500, section 14.1.4).
- A second dwelling. The ALR Use Regulation (section 34.3) permits one additional residence where the parcel has only one residence when construction begins, the two are not attached, and the sizes fit. On a parcel of 40 hectares or less, that means one residence of 500 square metres or less and one of 90 square metres or less. Whether the zoning allows it is a separate, municipal question.
- Where the house sits. Richmond’s zoning defines the farm home plate as the one contiguous part of the lot that holds the house, its accessory buildings, the driveway, decorative landscaping and the septic tank and field. On lots of 0.2 hectares or more the plate is at most 1,000 square metres (section 14.1.4.A). Its rear edge can be no more than 75 metres from the front lot line, and no part of the house can be more than 50 metres from a constructed public road abutting the property (section 14.1.6).
- Fill for the building pad. Section 35(a) of the ALR Use Regulation permits soil removal or fill placement to construct or maintain a structure for farm use or a principal residence where the total area involved is 1,000 square metres or less and, in a floodplain, the resulting elevation is consistent with the minimum set under local flood protection rules. The ALC’s August 2026 guideline on fill for a principal residence counts the driveway and parking areas needed to reach the residence in that area. It says proposals above 1,000 square metres need ALC authorization, and that residential fill areas over 2,000 square metres will generally not be considered suitable for the notice of intent route.
- What cannot go in the ground. Section 36 of the ALR Use Regulation prohibits construction or demolition waste, including masonry rubble, concrete, cement, rebar, drywall and wood waste, as fill on agricultural land, along with asphalt, glass, synthetic polymers, treated wood and unchipped lumber. On a rebuild, the old structure’s rubble cannot be buried or spread on the parcel as fill.
- The soil permit beside the building permit. In Richmond, the soil bylaw’s exemption for preparing the ground under foundations is written for non-ALR properties (Soil Deposit and Removal Bylaw 10200, section 3.3.1(e)). On ALR land, placing preload needs a soil permit unless a building permit or development permit for the building on that area has been issued and is still in force (section 3.3.2(b)), and work that needed ALC approval must follow the limits and conditions the ALC set (section 3.4.3).
- Farm buildings. Richmond’s bulletin BUILDING-51 asks an applicant for an agricultural building permit to show a farm business on the property and the need for the building. An existing farm business provides evidence that the property is assessed as farm and a signed letter from the operator. A new one submits a farm plan by a Professional Agrologist. The bulletin also says farm buildings are generally exempt from the flood construction level and, if exempt, should be built at grade to avoid unnecessary fill. The AG1 zone limits concrete and other impermeable construction at or below natural grade for agricultural buildings. Those limits do not apply to agricultural buildings other than greenhouses where all existing and proposed agricultural buildings on the lot cover 750 square metres or less (section 14.1.4).
- If the work departs from the rules. An ALC official can order a contravention to stop (Agricultural Land Commission Act, section 50), and a remediation order can require repair of the damage to agricultural land, including the removal of buildings or structures (section 52). Richmond’s General Manager can issue a stop work order under the soil bylaw (section 7.1.1).
None of this is a reason not to build. It is a reason to check the design against the rules before the permit set is drawn. Our post on building on agricultural land in BC covers the wider picture.
How Titrin approaches construction
The difference is the order of operations and who’s holding the file.
On a typical project, the regulatory work and the construction work sit with two companies that meet only at handoff. On a Titrin project, the agrology, the applications, and the build are one continuous engagement. The soil and agricultural conditions we assess up front inform the construction program at the back end, and the conditions attached to your ALC or municipal approval are understood by the people running the build, because they work beside the people who prepared the applications.
In practice:
- A single construction lead, Titrin’s licensed builder and general contractor, coordinating demolition, earthworks, foundations, framing, finishing, and landscaping in proper sequence.
- Permit and inspection scheduling kept aligned with your approval conditions, so the build doesn’t drift out of compliance.
- Trade and supplier management with quality checks at each stage.
- Regular progress reporting on milestones, change orders, and timeline.
- A construction program that respects the agricultural and environmental conditions identified up front, so what gets built matches what was approved.
A word on scope, because it matters: Titrin is a Professional Agrologist practice. Our soil and agricultural assessment, field observation, and test-pit work are performed under that professional standing. The construction itself is led by our licensed builder and general contractor, who holds the building credentials, prepares the estimates, and engages the trades and equipment. Where a project requires geotechnical, structural, or drainage engineering design, that work is carried out by a qualified engineer. The ALC and the municipality decide what is approved. We’re clear about who does what, and that clarity helps keep a project on the right side of the line.
Why build with Titrin
Built knowing how a regulator reads a file. Titrin is led by Tishtaar Titina, P.Ag., M.Sc., a Professional Agrologist registered with the BC Institute of Agrologists, with over a decade of experience across the Agricultural Land Commission and the City of Richmond. Knowing how a regulator reads a file shapes how the build is planned and documented.
Full-cycle delivery. Assessment, permitting, construction, and compliance, delivered as one engagement by one firm, not assembled from separate vendors.
One point of accountability. When a decision is needed, one team understands both the regulatory file and the construction reality, not a consultant pointing at a contractor pointing back.
Direct access to the P.Ag. You’re not handed off to a junior; the principal stays close to every file.
Titrin serves landowners, farmers, developers, and municipalities across Metro Vancouver, the Fraser Valley, and Vancouver Island. If you’re planning a build, especially on land where the Agricultural Land Reserve or a municipal approval is in play, book a consultation and we’ll walk through how one coordinated team can carry your project from approval to completion.
Our work





Frequently asked questions
Does Titrin hold a builder's licence, or is the work subcontracted?
Why hire the same firm for approvals and construction?
What types of projects do you build?
Can you build on land inside the Agricultural Land Reserve?
How big a house can I build on ALR land in Richmond?
Do I need ALC approval to bring in fill for a house or a farm building?
Can demolition rubble or broken concrete be used as fill on a farm property?
Does a barn or farm building in Richmond need a farm plan?
Do you handle the permits, or do I?
Related projects
New Farm Access Road
Titrin acted as the agrologist of record and file lead, preparing and securing an ALC Notice of Intent approval and negotiating environmental development-permit relief for a new farm access road in Richmond, then coordinating the build through Titrin's licensed builder and general contractor partner to completion.
View project →
Commercial Build-Out
Titrin's construction division acted as the contractor for an interior build-out of a commercial / light-industrial space within an existing building shell, with the work led by our licensed builder and general contractor, coordinating steel-stud partition framing, structural work, and fit-out, along with the trades, schedule, and inspection sequence through to completion. As this was an interior fit-out with no agricultural or Agricultural Land Reserve component, the Professional Agrologist's regulatory and agrology scope did not apply.
View project →
Custom Home Construction
Titrin's construction division delivered a full custom single-family home on a Metro Vancouver residential lot, from foundation and concrete through structural framing, roofing, and interior and exterior finishing, with all trades coordinated under one builder. The build was carried out by Titrin's licensed builder and general contractor; the Professional Agrologist role was limited to agrology and approvals support where a project calls for it.
View project →
Foundations & Concrete Works
Titrin's construction division delivered the concrete and earthworks scope on this build, formwork, footings, poured foundations and slabs, retaining walls, and in-floor radiant rough-in, under the firm's licensed builder and general contractor, who held the building credentials and managed the trades, equipment, and schedule. Where the property carried an Agricultural Land Reserve or municipal overlay, Tishtaar Titina, P.Ag., handled the agrology and approvals so the foundation work stayed aligned with what was permitted.
View project →